Position plywood clips onto the top or upper horizontal edge of the installed plywood panels between each rafter.
Proper installation of hclips on roof sheathing.
How to use plywood clips step 1.
Check the nailing surface is level step 2.
Keep these tips in mind when roofing in hurricane areas.
Space joints on adjoining rows by two framing members.
Once you ve spaced out where you are going to attach the clips they are ready to be attached.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
Click to expand contents.
Click to expand contents.
Fasten panels with a minimum of.
Install a full horizontal row of plywood sheathing following standard practices.
To provide information about proper roof sheathing installation emphasize its importance in coastal construction and illustrate fastening methods that will enhance the durability of a building in a high wind area.
Properly fasten panels including fastening and spacing hints step 4.
And scroll down to see more details on each with installation hints and tips below.
Ventilate the roof according to current building codes step 3.
Proper installation of apa rated sheathing for roof applications step 1.
Slide the sheet one rafter width over the end of the roof so the edge is centered on the next rafter offset one rafter spacing from the first piece of installed sheathing from the row below.
Keep nails 3 8 inches from the edges.
The connection between the roof sheathing and the structure is a vulnerable point that is known to fail during a hurricane.
Cover sheathing with.
Not always required but a good idea.
Install the next row of plywood into position by.
These nails go through the base plate of the clip.
Hammer in the clip to the parallel beam using 2 5 inches 6 4 cm nails.
Home builder s guide to coastal construction 7 1.
Some older h clips do not provide a built in gap.
Install h clips between adjacent rows of panels every 12 to 16 inches but not over framing members.
Provide roof ventilation according to building codes see hints below and figure 2.
Roof sheathing installation 1 of 3.
This process starts with nailing them into the parallel beam.